Gostaria de reagir a esta mensagem? Crie uma conta em poucos cliques ou inicie sessão para continuar.


 
InícioInício  ProcurarProcurar  Últimas imagensÚltimas imagens  RegistarRegistar  EntrarEntrar  

 

 Por onde anda o Portas??????????????

Ir para baixo 
AutorMensagem
Convidad
Convidado




Por onde anda o Portas?????????????? Empty
MensagemAssunto: Por onde anda o Portas??????????????   Por onde anda o Portas?????????????? EmptyQui Abr 17, 2008 12:03 pm

Era só para lhe mostrar isto..............

Por onde anda o Portas?????????????? 93322_1
The first A400M airlifter, which has passed its “power-on” tests, will soon be fitted with its engines in preparation for its first flight. (Airbus Military photo)

First A400M Moves to Next Assembly Station Approaching First Flight


(Source: EADS; dated April 14, web-posted April 16, 2008)

MADRID --- The first A400M, MSN001, has just left station 40 where all the aircraft systems’ interfaces have been connected and the electrical system has been successfully tested with power-on. These activities are in line with the current programme plan.

From station 40 the aircraft has been moved to station 35 where all the systems on board will be checked for compliance with design requirements and data automatically recorded for later analysis and evaluation. This represents an important step forward as station 35 is one of the few stations left before First Flight.

In previous operations undertaken at station 40, the complete airframe was assembled with the wings and the vertical and horizontal tail planes being joined to the fuselage. On this particular first aircraft, the work at this station was temporary interrupted to proceed with the required structural ground test prior to First Flight.

Engine installation on MSN001 is now underway. Since delivery to FAL, intensive work around the engines has been performed following the scheduled activities:

Incoming inspection, engine build up/dressing process (station 25-equipping), in which the engines are equipped with the electrical harnesses, different pipes and airframe components required prior installation on the MSN001. Normal functioning checks and power assurance have also being performed. At station 25, the flight test instrumentation is also installed on this development aircraft. Later, the four engines will be moved to station 20 for installation on the aircraft.

Engine Flight Clearance activities continue and the dedicated Flying Test Bed, a modified C-130 aircraft on which a TP400 engine has been installed, is being readied to begin the flight test programme, which will begin shortly.


EADS is a global leader in aerospace, defence and related services. In 2007, EADS generated revenues of EUR 39.1 billion and employed a workforce of about 116,000. The Group includes the aircraft manufacturer Airbus, the world's largest helicopter supplier Eurocopter and EADS Astrium, the European leader in space programmes from Ariane to Galileo. Its Defence & Security Division is a provider of comprehensive systems solutions and makes EADS the major partner in the Eurofighter consortium as well as a stakeholder in the missile systems provider MBDA. EADS also develops the A400M through its Military Transport Aircraft Division.

-ends-

FONTE
Ir para o topo Ir para baixo
 
Por onde anda o Portas??????????????
Ir para o topo 
Página 1 de 1
 Tópicos semelhantes
-
» Portas apanhado no Furacão
» Anda um tigre à solta .............................!!!
» o almijado anda CALADO
» Portas processa ministro da Agricultura
» As fotocópias de Paulo Portas

Permissões neste sub-fórumNão podes responder a tópicos
 :: Portugal-
Ir para: